What is the main PSSR document?
The central PSSR document is the Written Scheme of Examination. It identifies relevant parts of the pressure system, the nature of examination and the examination intervals.
Pressure Systems Safety Regulations 2000
PSSR support for pressure systems, written schemes of examination, competent person inspections and examination planning.
City Inspection Services helps users and owners understand what must be examined, when it is due and what evidence is needed for a defensible pressure-system compliance file.

Expert guidance
PSSR is concerned with stored pressure energy and the risk of system failure. The central compliance document is the Written Scheme of Examination, which identifies the relevant parts of the system, what must be examined and how often.
A pressure system examination should be planned before the due date because safe access may require isolation, depressurisation, cooling, draining or coordination with maintenance contractors.
City Inspection Services helps owners and users keep the pressure-system file coherent: written scheme, reports, repairs, modifications, certificates, safe operating limits and next examination dates.
Direct answers
The central PSSR document is the Written Scheme of Examination. It identifies relevant parts of the pressure system, the nature of examination and the examination intervals.
No. The requirement depends on the system configuration, pressure, volume and use. A competent review should confirm whether the system needs a written scheme and what parts must be examined.
Pressure-system work may need isolation, cooling, draining, access preparation or coordination with maintenance contractors. Leaving it until the due date can create avoidable downtime.
Compliance planning
A strong inspection record should show the asset, the examination scope, defects, urgency, follow-up actions and the next due date. City Inspection Services keeps this practical for site teams and management.
Evidence
Risk indicators
Method
Prepare the visit
Use this checklist before a pressure-system examination or written scheme review.
Frequently asked questions
It is the document that specifies which parts of a pressure system must be examined, the nature of the examination and the interval between examinations.
Not every compressor system falls into the same requirement, but many compressed air systems need assessment and may require a written scheme and examination depending on pressure, volume and system configuration.
Some checks may be possible in service, but many examinations need safe isolation, access or preparation. The written scheme and competent person determine what is required.
Authority map
Equipment
Compressed air systems are common in workshops and production sites, but the written scheme and examination evidence often lags behind equipment changes.
Equipment
Boilers and pressure systems need coherent written scheme evidence, safe operating limits and planned examination access.
Sector
Manufacturing and engineering sites usually need inspection evidence across machinery, lifting accessories, compressors, hazardous substances and maintenance access.
Sector
Warehousing and logistics sites rely on high-use handling equipment, attachments, loading bay plant and compressed air systems that need clear due-date control.
Sector
Facilities managers need one clear view of inspection evidence across buildings, tenants, plant rooms, access work and contractor activity.
Sector
Hospitality and retail sites need inspection work that respects trading hours, public areas, kitchens, passenger lifts, cleaning products and building access.
Case studies
Representative case study for compressed air PSSR evidence and written scheme review in an Aberdeen workshop.
Representative marine-sector case study for LOLER lifting accessories and PSSR pressure-system planning in Peterhead.
Official guidance
Use official HSE guidance alongside site-specific competent-person inspection advice.
Local coverage
Local PSSR enquiries often come from production sites, workshops, food and drink operators, healthcare premises and facilities teams responsible for compressors, boilers or refrigeration plant.
Book an inspection
Send the equipment list, site postcode and any due dates. City Inspection Services will confirm scope, availability and the most sensible inspection schedule.
Quote intake
Site, assets, due dates.