North East Scotland / Energy supply chain workshop

Aberdeen Workshop PSSR Compressor Review

Representative case study for compressed air PSSR evidence and written scheme review in an Aberdeen workshop.

This is a representative, anonymised case study written to show common inspection challenges and outcomes without exposing client details.

PUWERPSSRAberdeenEvidence improved
Lorry loader crane, telehandler and forklifts in a workshop for LOLER and PUWER inspection
Workshop lifting and handling plant — LOLER and PUWER inspection.

Challenge

What needed control

The site had compressors and air receivers with maintenance records available, but the written scheme evidence did not clearly match the installed plant.

Location

Aberdeen

North East Scotland

Work completed

Inspection actions

  • Reviewed pressure system records and scheme references
  • Checked equipment IDs against the workshop layout
  • Identified missing evidence needed before examination
  • Planned access around permit and induction requirements

Outcome

Evidence improved

  • The pressure-system file became easier to audit
  • The responsible person had a clear list of scheme updates
  • Future examinations could be scheduled before operational deadlines

Enquiry fit

Customer situations covered

  • Aberdeen workshops reviewing compressor PSSR evidence
  • Scottish sites checking whether the written scheme matches installed plant
  • Maintenance teams planning pressure-system examination access

Related equipment

Asset pages connected to this case.

Air Compressor PSSR Written Scheme

Compressed air systems are common in workshops and production sites, but the written scheme and examination evidence often lags behind equipment changes.

Book an inspection

Need a clear compliance report?

Send the equipment list, site postcode and any due dates. City Inspection Services will confirm scope, availability and the most sensible inspection schedule.

LOLERPUWERPSSRThorough examination

Quote intake

Site, assets, due dates.