Equipment guidance

Inspection pages by asset type.

Start from the item you need checked, then follow the guide to the likely LOLER, PUWER or PSSR inspection route.

Asset identityInspection scopeDefect evidence

LOLER

Passenger Lift LOLER Inspection

Passenger lifts create a high-expectation compliance duty because building users, residents, staff and visitors rely on them every day.

LOLER + PUWER

Vehicle Lift LOLER Inspection

Vehicle lifts in garages and workshops sit at the overlap between lifting equipment condition, operator safety and clear workshop records.

PSSR

Air Compressor PSSR Written Scheme

Compressed air systems are common in workshops and production sites, but the written scheme and examination evidence often lags behind equipment changes.

PSSR

Boiler and Pressure System PSSR

Boilers and pressure systems need coherent written scheme evidence, safe operating limits and planned examination access.

PUWER

Dock Leveller and Loading Bay PUWER

Loading bays combine vehicle movements, work equipment, pedestrians, dispatch pressure and high-use equipment that deteriorates quickly.

Book an inspection

Need a clear compliance report?

Send the equipment list, site postcode and any due dates. City Inspection Services will confirm scope, availability and the most sensible inspection schedule.

LOLERPUWERPSSRThorough examination

Quote intake

Site, assets, due dates.