Why it matters
Risk and evidence
- Lift failure can put technicians at serious risk
- Workshops often have several lifts with different due dates
- Defects must be clear enough for repair decisions
- PUWER and LOLER duties can overlap
LOLER + PUWER
Vehicle lifts in garages and workshops sit at the overlap between lifting equipment condition, operator safety and clear workshop records.
Vehicle lifts used at work should have current LOLER evidence and the wider equipment condition, controls and use may also need PUWER attention.

This guide is useful for garages, workshops and fleet teams preparing vehicle lift inspection evidence in Edinburgh, Glasgow, Fife, Aberdeen and the North East.
Why it matters
Inspection scope
Records
Common findings
From examinations across Scotland and the North East, these are the issues that most often weaken the compliance file or need a repair decision:
Vehicle lifts used at work are lifting equipment and should have suitable thorough examination evidence.
PUWER can apply to the wider work equipment condition, suitability, controls and safe use in the workshop.
Prepare the lift list, previous reports, service notes, repair evidence and access to each bay.
Related expertise
Independent LOLER thorough examinations for lifts, hoists, lifting accessories, MEWPs, vehicle lifts, cranes, tail lifts and lifting equipment used across work premises.
PUWER inspections for work equipment that must remain suitable, maintained, guarded and safe for employees to use.
Manufacturing and engineering sites usually need inspection evidence across machinery, lifting accessories, compressors, hazardous substances and maintenance access.
Facilities managers need one clear view of inspection evidence across buildings, tenants, plant rooms, access work and contractor activity.
Representative case study showing how LOLER and PUWER evidence can be grouped for a manufacturing site in Fife.
Book an inspection
Send the equipment list, site postcode and any due dates. City Inspection Services will confirm scope, availability and the most sensible inspection schedule.
Quote intake
Site, assets, due dates.