Why it matters
Risk and evidence
- Stored pressure failures can be severe
- Systems are often modified without record updates
- Receivers and protective devices need clear identification
- Examinations may require isolation or draining
PSSR
Compressed air systems are common in workshops and production sites, but the written scheme and examination evidence often lags behind equipment changes.
Many compressed air systems need assessment under PSSR and may require a Written Scheme of Examination before examination by a competent person.

This guide helps workshops, production sites and facilities teams prepare compressor records, written scheme evidence and pressure-system inspection access.
Why it matters
Inspection scope
Records
Common findings
From examinations across Scotland and the North East, these are the issues that most often weaken the compliance file or need a repair decision:
Not every compressor has the same requirement. The system configuration, pressure, volume and use need assessment.
It sets out which relevant parts of the pressure system must be examined, how and when.
Some checks may be possible in service, but many examinations need safe isolation, draining, cooling or access preparation.
Related expertise
PSSR support for pressure systems, written schemes of examination, competent person inspections and examination planning.
Manufacturing and engineering sites usually need inspection evidence across machinery, lifting accessories, compressors, hazardous substances and maintenance access.
Warehousing and logistics sites rely on high-use handling equipment, attachments, loading bay plant and compressed air systems that need clear due-date control.
Care and healthcare premises need careful scheduling because lifts, cleaning products, plant rooms and access work can affect vulnerable building users.
Marine, energy and food production environments often combine heavy use, wet or corrosive conditions, pressure systems, lifting accessories and strict production controls.
Representative case study for compressed air PSSR evidence and written scheme review in an Aberdeen workshop.
Representative marine-sector case study for LOLER lifting accessories and PSSR pressure-system planning in Peterhead.
Book an inspection
Send the equipment list, site postcode and any due dates. City Inspection Services will confirm scope, availability and the most sensible inspection schedule.
Quote intake
Site, assets, due dates.