Needs
Inspection priorities
- Forklift attachment traceability
- Dock leveller and loading bay PUWER checks
- Compressed air system evidence
- Shift-aware inspection scheduling
- Hired equipment document control
LOLER + PUWER + PSSR
Warehousing and logistics sites rely on high-use handling equipment, attachments, loading bay plant and compressed air systems that need clear due-date control.
Livingston, Glasgow, Gateshead, Newcastle and central belt distribution sites often need route-based inspection planning around dispatch peaks.
Needs
Assets
Evidence
Direct answers
Yes. Visits can be planned around loading windows, shift handovers and high-traffic areas.
Loose lifting accessories, temporary attachments, hired equipment and secondary loading bay kit are often missed.
Related pages
Forklift trucks, attachments and handling equipment can create mixed LOLER and PUWER duties depending on how the equipment is used.
Compressed air systems are common in workshops and production sites, but the written scheme and examination evidence often lags behind equipment changes.
Loading bays combine vehicle movements, work equipment, pedestrians, dispatch pressure and high-use equipment that deteriorates quickly.
Representative case study showing how LOLER and PUWER evidence can be grouped for a manufacturing site in Fife.
Representative case study for compressed air PSSR evidence and written scheme review in an Aberdeen workshop.
Representative logistics case study for forklift attachments, loading bay equipment and grouped inspection planning.
Book an inspection
Send the equipment list, site postcode and any due dates. City Inspection Services will confirm scope, availability and the most sensible inspection schedule.
Quote intake
Site, assets, due dates.