Aberdeenshire / Marine and processing

Peterhead Marine Lifting and Pressure System Inspection

Representative marine-sector case study for LOLER lifting accessories and PSSR pressure-system planning in Peterhead.

This is a representative, anonymised case study written to show common inspection challenges and outcomes without exposing client details.

LOLERPSSRPeterheadEvidence improved
Harbour crane gangway and jib examination at a Scottish quayside
Harbour crane examination at a Scottish quayside.

Challenge

What needed control

A wet and heavy-use environment needed lifting accessory evidence and pressure-system planning without disrupting process activity.

Location

Peterhead

Aberdeenshire

Work completed

Inspection actions

  • Prioritised lifting accessories used for heavy handling
  • Reviewed corrosion and exposure-related condition notes
  • Checked pressure-system records and isolation planning
  • Produced clear actions for maintenance and management review

Outcome

Evidence improved

  • Safety-critical items were prioritised first
  • Environmental deterioration was recorded clearly
  • Pressure-system planning could be aligned with shutdown access

Enquiry fit

Customer situations covered

  • Peterhead marine sites managing lifting and pressure-system evidence
  • Workshops in wet environments planning corrosion checks
  • Aberdeenshire operators prioritising heavy-use lifting accessories

Related equipment

Asset pages connected to this case.

Air Compressor PSSR Written Scheme

Compressed air systems are common in workshops and production sites, but the written scheme and examination evidence often lags behind equipment changes.

Book an inspection

Need a clear compliance report?

Send the equipment list, site postcode and any due dates. City Inspection Services will confirm scope, availability and the most sensible inspection schedule.

LOLERPUWERPSSRThorough examination

Quote intake

Site, assets, due dates.