PSSR Inspection Readiness Checklist

Use this checklist before a pressure-system examination or written scheme review.

PSSRBefore visitEvidence close-out

Before the visit

Scope

  • Confirm the system and equipment included
  • Check whether a Written Scheme of Examination exists
  • Identify isolation, cooling, draining or access requirements
  • Confirm safe operating limits where available
  • Plan attendance around shutdown windows

Records

Evidence

  • Written Scheme of Examination
  • Previous examination reports
  • Certificates and manufacturer information
  • Repair or modification records
  • Maintenance and protective device evidence

Site access

Attendance

  • Confirm permit or induction requirements
  • Make plant rooms accessible
  • Arrange isolation support where needed
  • Provide a site contact familiar with the system
  • Confirm any contractors required for preparation

After report

Close out

  • Review written scheme updates
  • Close out defects or restrictions
  • Record modifications and repairs
  • Update next examination dates
  • Keep scheme and reports together

Questions

PSSR readiness FAQs.

What is the main PSSR document?

The central PSSR document is the Written Scheme of Examination. It identifies relevant parts of the pressure system, the nature of examination and the examination intervals.

Do all compressors need the same PSSR approach?

No. The requirement depends on the system configuration, pressure, volume and use. A competent review should confirm whether the system needs a written scheme and what parts must be examined.

Why should PSSR be planned early?

Pressure-system work may need isolation, cooling, draining, access preparation or coordination with maintenance contractors. Leaving it until the due date can create avoidable downtime.

Book an inspection

Need a clear compliance report?

Send the equipment list, site postcode and any due dates. City Inspection Services will confirm scope, availability and the most sensible inspection schedule.

LOLERPUWERPSSRThorough examination

Quote intake

Site, assets, due dates.