PUWER checklist

PUWER Inspection Readiness Checklist

Use this checklist to prepare work equipment records and reduce disruption during PUWER inspection.

PUWERBefore visitEvidence close-out

Before the visit

Scope

  • List machinery, mobile plant and work equipment requiring review
  • Identify equipment that has been moved, modified or repaired
  • Confirm higher-risk machinery and guarded equipment
  • Make maintenance staff or supervisors available
  • Prepare safe access to work areas

Records

Evidence

  • Equipment register
  • Maintenance and repair history
  • Risk assessments and safe systems of work
  • Training or instruction evidence
  • Previous inspection records and defect actions

Site access

Attendance

  • Agree safe inspection zones
  • Plan around production or dispatch periods
  • Confirm isolation arrangements
  • Explain foreseeable misuse or recurring issues
  • Provide keys or access to guarded areas where safe

After report

Close out

  • Prioritise defects affecting operator safety
  • Record repair or control action
  • Update equipment status
  • Review training or procedures if needed
  • Set suitable reinspection intervals

Questions

PUWER readiness FAQs.

What does a PUWER inspection look at?

A PUWER inspection looks at whether work equipment is suitable, maintained, guarded, controlled and safe for the task. The inspection should reflect the way the equipment is actually used on site.

Is PUWER only for factories?

No. PUWER can apply wherever work equipment is used, including workshops, warehouses, hospitality, care premises, offices, public buildings and maintenance teams.

When should PUWER inspection be reviewed?

PUWER inspection should be reviewed after installation where safety depends on installation conditions, after events that could affect safety, and at suitable intervals where deterioration could create danger.

Book an inspection

Need a clear compliance report?

Send the equipment list, site postcode and any due dates. City Inspection Services will confirm scope, availability and the most sensible inspection schedule.

LOLERPUWERPSSRThorough examination

Quote intake

Site, assets, due dates.